{"id":6828,"date":"2022-03-14T21:53:24","date_gmt":"2022-03-14T13:53:24","guid":{"rendered":"https:\/\/slash.bravefactor.com\/?post_type=resources&#038;p=6828"},"modified":"2024-02-21T11:41:36","modified_gmt":"2024-02-21T03:41:36","slug":"improving-outcomes-through-agile-contracts","status":"publish","type":"resources","link":"https:\/\/slash.co\/articles\/improving-outcomes-through-agile-contracts\/","title":{"rendered":"Improving outcomes through Agile contracts"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Starting a new contract isn\u2019t always simple. When a contract starts, both parties are willing to accept risk to a certain level. Every contract usually addresses 3 variables:\u00a0\u00a0<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Cost of delivery of the scope<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Time or speed of delivery<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Scope of work: what is the client going to get\u00a0<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">There are <\/span><b>two types of contracts<\/b><span style=\"font-weight: 400;\">:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Fixed contracts: where at least 2 out of the 3 variables are fixed. Usually cost and scope, though sometimes timeline is locked in as well.<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Agile contracts: where maximum 2 variables are fixed, and likely only 1 (cost).<\/span><\/li>\n<\/ul>\n<p><span style=\"font-weight: 400;\">At Slash, the majority of our contracts are agile. In this article, we consider why various challenges and conflicts arise in a contract and how different approaches can be helpful.\u00a0<\/span><\/p>\n<h3>Challenges of fixed contracts<\/h3>\n<p><span style=\"font-weight: 400;\">Fixed contracts are <\/span><b>suitable for standard projects<\/b> <span style=\"font-weight: 400;\">that do not have a high level of complexity or where all the technical specifications are very well understood (with a margin of error of less than 5%). They can also be beneficial in terms of <\/span><b>cost control<\/b> <span style=\"font-weight: 400;\">and <\/span><b>risk minimization<\/b><span style=\"font-weight: 400;\">.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, common challenges with fixed contracts are:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Handling uncertainty beyond the original specifications<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Scope creep and change requests<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Tracking and accounting for project status<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">If billing is fixed, incentives to shortcut effort<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">If timeline is fixed, incentives to shortcut effort<\/span><\/li>\n<\/ul>\n<h3>Benefits of Agile contracts<\/h3>\n<p><span style=\"font-weight: 400;\">As there are challenges in most contracts, the significance of agile contracts becomes noticeable. CEO of Slash Andries De Vos notes that both parties in a contract are partners that optimize for business outcomes by establishing deep collaboration and trust.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Common benefits of agile contracts are:<\/span><\/p>\n<p><b>Flexibility<\/b><\/p>\n<p><span style=\"font-weight: 400;\">In an agile contract, the client can choose which project components should be fixed: scope, time, or cost. If the client wants scope to be fixed, then time and budget will be adjusted, potentially enabling a client to finish ahead of time or budget. Alternatively, keeping the cost fixed can be more convenient for the client if they do not want the project budget to go beyond a certain amount and then scope becomes a variable.<\/span><\/p>\n<p><b>Encouraging collaboration<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Agile methodology is focused on collaboration and result-oriented work. With an agile contract, the parties will need to discuss work progress and interim results frequently. This builds trust and rapport, and most importantly, it enables the client to be involved at all stages of the project and share comments and suggestions early on.<\/span><\/p>\n<p><b>Optimizing workflow<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Agile methodology and therefore, agile contracts break the project into several steps, which allows the parties to have a clear and comprehensive outline of what needs to be done. Additionally, the parties can evaluate the work at each sprint, not waiting for the final release.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Now, let\u2019s look at the challenges of agile contracts:<\/span><\/p>\n<p><b>Less suitable for simple projects<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Since agile requires significant process overhead for a team to manage (e.g additional meetings\/ceremonies etc), it may be less suitable for standard, simple projects. If the scope and cost of the project are well understood, the project may not require the flexibility of the agile approach and contracting.<\/span><\/p>\n<p><b>Requires trust<\/b><\/p>\n<p><span style=\"font-weight: 400;\">As the methodology focuses so heavily on collaboration, it requires that parties invest in building trust and collaborate in that spirit, which might be challenging if the client is unfamiliar with the agile methodology or adopts a traditional client-vendor procurement model.<\/span><\/p>\n<h3>Different approaches for Agile contracts<\/h3>\n<p><span style=\"font-weight: 400;\">There are two widely adopted approaches to agile contracts.<\/span><\/p>\n<p><b>Approach 1: fix scope, time\/cost flexible<\/b><\/p>\n<p><span style=\"font-weight: 400;\">The scope remains fixed, and time and cost become flexible. In this approach, there can be further estimations of time and cost through continuous and regular backlog grooming. Detailed scope may evolve, but the broad-stroke scope is agreed upon and any material changes to the scope can be accommodated through a \u201cswitch and replace\u201d approach.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This is a common approach when the project owner has a clear understanding of the product outcomes they want to achieve but the detailed scope and technical complexities to deliver the project are not fully fleshed out.<\/span><\/p>\n<p><b>Approach 2: cost (and sometimes time) fixed and scope flexible<\/b><\/p>\n<p><span style=\"font-weight: 400;\">In this approach we optimize for a fixed team capacity that can deliver a relatively predictable workload over a period of time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The specifications of that workload may not be fully defined yet or in some cases may be totally unknown and emergent based on user feedback, or new strategic initiatives.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">This approach is common when developing the products which have a dynamic roadmap: live products with continuous user feedback, early stage startups trying to hustle to find product-market-fit, or strategic projects with regular re-prioritization of features.\u00a0<\/span><\/p>\n<h3>What contracting method is right for you: the cynefin framework<\/h3>\n<p><span style=\"font-weight: 400;\">The Cynefin framework is a decision-making model that helps leaders adjust to different and unexpected situations. An important element of it is drawing examples and conclusions from the leaders\u2019 own experience and organization, its history. The framework is designed to assist with quick assessment of the situation and correct choice of action. It is useful in product development and organizational strategy. The basis of the framework is categorization of situations into five domains, which are defined by cause-and-effect relationships, depending on how clear or complicated the situation is.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">At Slash, we usually work on complex custom systems. This type of work is more suitable for Agile development, and the Cynefin framework articulates well why complex emergent projects may require agile. Apart from allowing more flexibility, it also helps when unexpected changes and issues arise. We find the Agile methodology particularly useful for the type of projects that we do, and in our experience, agile contracts do contribute to improving outcomes of the project.<\/span><\/p>\n","protected":false},"featured_media":6870,"parent":0,"template":"","resource-topic":[54],"resource-type":[43],"class_list":["post-6828","resources","type-resources","status-publish","has-post-thumbnail","hentry","resource-topic-agile-development","resource-type-articles"],"_links":{"self":[{"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/resources\/6828","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/resources"}],"about":[{"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/types\/resources"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/media\/6870"}],"wp:attachment":[{"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/media?parent=6828"}],"wp:term":[{"taxonomy":"resource-topic","embeddable":true,"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/resource-topic?post=6828"},{"taxonomy":"resource-type","embeddable":true,"href":"https:\/\/slash.co\/wp-json\/wp\/v2\/resource-type?post=6828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}